May 26th – 2020 Presidential Politics – Trump Administration Day #1223 | The Last Refuge

May 26th – 2020 Presidential Politics – Trump Administration Day #1223 | The Last Refuge

Note: Most of the WBTW related social media accounts are covering coronavirus, politics, or illegal alien crimes. We will probably be in a quiet period regarding wall content until the next project(s) are near completion.
The praises (much of which are older news) have been provided for those who wish to give thanks for them before praying for the wall prayer requests. I may add to, trim back, or simplify from time to time as projects/events progress or come to completion. If there is any new wall news I’ll list them in the update below. Otherwise, feel free to page down or scroll past.
– – – – –
Sunday night update – 5/24/20 – (See link above.)

– Flashback… The first Fisher Industries promo video for Project 1 over Memorial Day weekend (2019). This came after months of the leftist anti-wall trolls saying nothing would ever get built and wall supporters were wasting their money on a scam. This video came 3 days into the construction of the wall.
– 2 older wall videos from Project 1 after the wall was completed. These videos are from Fisher Industries YouTube channel. Fishers versions have the 2160p resolution option which WeBuildTheWall’s channel does not.

– WeBuildTheWall promotional giveaway post.

– – – – –
Monday night update – 5/25/20

– Memorial Day post w/ video.
– Memorial Day post w/ photo.

– Tweet w/ article: The Wall Went Up Memorial Day Weekend
– Tweet w/ photo of David Niño Rodriguez at Project 1.

– – – – –
***Praise: 🧱 (Project 1: May/June 2019)… WBTW/Fisher Industries was able to build a half mile wall up the side of a mountain in 11 days (with zero safety incidents), cutting off 19 major drug cartel trails, and closing off one of the worst areas along the border… (Sunland Park, NM)
***Praise: 👍 (11/20/19)… DHS Secretary Chad Wolf & CBP Chief gave a huge endorsement to WeBuildTheWall while visiting Project 1. CBP Chief called it a “Game Changer”. It’s the only time CBP or DHS have ever endorsed a wall builder.
***PRAISE: 🧱 (12/2/19)… Fisher Sand & Gravel was awarded a $400M border wall contract to build 31 miles of wall in the Cabeza Prieta National Wildlife Refuge in Yuma County, Arizona.
(Fisher receives $268M of this $400M project)(Estimated contract completion date is Dec 30, 2020.)

***Praise: (12/4/19)… Brian Kolfage & his family were given the opportunity to visit the White House.
***Praise: While the Temporary Restraining Order(s) were in place, Fisher Industries and crews were still able to keep working on some aspects of Project 2 from the Dec. 5th hearing to Dec 12th (after which they were off for the holidays).
***Praise: (Jan 3)… Judge Crane lifted/removed section 8b from the TRO so that Fisher was able to continue to “shave, grade, or cut the riverbank.”
***Praise: (Jan 9)… Judge Crane lifted/removed the TROs from both the Federal government’s lawsuit (on behalf of the IBWC) and the North American Butterfly Association’s lawsuit (on behalf of Marianna Trevino-Wright’s National Butterfly Center) against Fisher Sand and Gravel Co.
***Praise: 🧱 (Project 2 complete: Feb 17)… Fisher Industries was able to build 3.5 miles of wall along the Rio Grande River in Mission, Texas. Project 2’s “water wall” design is the first border wall that’s ever been built inside the flood plain.

***Praise: 🔍 (Reported on 12/18/19)… Senator Kevin Cramer was able to complete his in-depth review of the USACE’s procurement process and send a letter with his findings and recommendations to President Trump on 12/6/19.
***Praise: (Feb 6)… Rep. Warren Petersen’s (R-AZ) bill, HB 2084, making it easier to build border wall on private property in Arizona, passed AZ House on reconsideration with 31-29 party line vote. Next, it goes to the Senate.
***PRAISE: 🧱 (5/6/20)… Fisher Sand & Gravel was awarded a $1.28B border wall contract to build 42 miles of wall in southern Arizona, most of which will run from Nogales to the eastern boundary of the Tohono O’odham Nation. It’s the largest border wall contract that’s ever been awarded. The project includes seven segments and will be painted black.
(Project: Tucson Package 3), (Complex terrain, which includes rugged mountains and water crossings)

🙏 Prayer for the work crews. 🙏
Heavenly Father, we pray in Jesus’ name:
– for safety and health for the work crews and their families while they stay home during the temporary work shutdown; for safety and good weather for the work crews when they start up work again on Project 3, 4, 5… as well as the Federal 7.6M (800 feet) and the 1.28B (42 mile) contracts for wall in Arizona; that they would be able to continue uninterrupted until completion.

– that the DoD IG’s office audit of the $400 million border wall contract which the USACE awarded Fisher Sand & Gravel would show everything is fair and above board; that the swamp in DoD and USACE wouldn’t be able to corrupt the process; & that Fisher would be authorized to proceed with the project as planned. (Backstory/timeline)
***Praise: (4/15/19)… Fisher Industries has been awarded a 7.6M contract modification to build 800 linear feet of 30-foot bollard barrier while the original 400M contract is still under review by the DoD IG’s office. My guess is this will give further evidence to the IG that Fisher Industries was justified in receiving the original 400M contract. (Details)

– for WBTW/Fisher Industries regarding the ongoing lawsuits; that both sides would be able to resolve any issues and the lawsuits would be dismissed.
(May 6)… Positive developments in today’s hearing.
“Warner and Courtois sounded cautiously optimistic that engineers could work out any remaining problems.”
“In the meantime, the IBWC and Fisher Industries will review the hydraulic analysis.”
“Engineers with the United States section of the IBWC also sent hydraulic models to their counterparts in Mexico, who may offer comments or objections.”
“Attorney Javier Peña, who represents the butterfly association, said his client wanted to independently review the hydraulic model.”
“U.S. District Judge Randy Crane agreed to schedule a status conference in 60 days.”

– that WBTW would be able to find corporate sponsors for Project 3. (They already have a major construction equipment manufacturer and are looking for a solar LED security lighting manufacturer or supplier.)
– that Rep. Warren Petersen’s (R-AZ) bill, HB 2084, making it easier to build border wall on private property in Arizona would get passed.
(Feb 6)… The bill passed AZ house on reconsideration with 31-29 party line vote. Next, it goes to the Senate.

– for the bi-national summit with the Mexican IBWC and American politicians that WBTW will be hosting; for open lines of communication/understanding; and that WBTW/Fisher Industries would learn what they need to know to facilitate the sign off and approval of their projects by the Mexican IBWC.

– for 100% safety/health/guidance/direction/salvation(through faith in Christ Jesus) for the work crews, security personnel, legal teams, CBP, DHS, Army, National Guard and all involved in Project’s 2, 3, 4, 5 and other projects; and for WBTW/Fisher Industries as they work with private landowners to secure more property to build on
– that work would go smoothly with continual, innovative improvements in method/process/efficiency and quality of construction; and with transitioning as they scale up capacity(manpower, equipment, etc.) to build larger projects
– that there would be no outside interference (cartels, IBWC, courts/judges, protesters, swamp, etc.) and that if outside interference takes place that it would only work toward WBTW/Fisher Industries/USA’s benefit (exposing corruption, raising awareness, fundraising, etc.)

– that Project 2’s wall will prove that the design is sound and that WBTW/Fisher Industries are capable of safely and effectively building it on a large scale in the Rio Grande Valley, with a superior build, at the lowest price
– that the federal government would provide funding for WBTW/Fisher Industries to build 250+ miles of wall on Private Property in Texas
– that the Government would purchase all of WBTW/Fisher Industries projects so the funds can be rolled into future projects and Fisher Industries will be able to scale up with additional equipment and manpower as needed.

🌟 “The more that a broken system tells you that you’re wrong, the more certain you must be that you must keep pushing ahead. Because it’s the outsiders who change the world and will make a real and lasting difference. Nothing worth doing ever came easy. Treat the word impossible as nothing more than motivation.” ~ President Donald J. Trump 🌟

This content was originally published here.

0
Like
Save

Comments

Write a comment

*